Modern Engineering Solutions

72 / 100

How To Reduce The Operating Cost Of Reverse Osmosis Systems | Weftec Series | EP1

MODERN ENGINEERING SOLUTIONS > BLOG > PODCAST >  How To Reduce The Operating Cost Of Reverse Osmosis Systems | Weftec Series | EP1

-> Join Engineers For Communities Group on Linkedin
-> Watch this Live show here: LinkedIn 
-> If you are interested in being a guest on a live show fill book an Onboarding Call 

★ RO System: Converts seawater into fresh water through reverse osmosis.

★ High-pressure pump: Powers RO process by pushing seawater through a membrane.

★ Energy-efficient: Reduces high-pressure pump’s workload, cuts energy use up to 60%.

★ Self-operated: Runs without electricity, driven by brine flow.

★ Minimal maintenance: With a single, durable ceramic part, no scheduled upkeep needed.

★ Cost-effective: PX Pressure Exchanger offers a low life cycle cost for RO projects.

Join us on this insightful Engineers for Communities new series episode 1 with our guest, Eric Kadaj, MBA from the Energy Recovery, Inc. as we dive deep into reverse osmosis system.