Modern Engineering Solutions

72 / 100

Wastewater Engineering: Sludge Reduction, Grit Removal & Cost-Saving Dryers | WEFTEC SERIES | EP5

MODERN ENGINEERING SOLUTIONS > BLOG > PODCAST >  Wastewater Engineering: Sludge Reduction, Grit Removal & Cost-Saving Dryers | WEFTEC SERIES | EP5

-> Join Engineers For Communities Group on Linkedin
-> Watch this Live show here: LinkedIn 
-> If you are interested in being a guest on a live show fill book an Onboarding Call 

In this informative episode, learn about:

★ How solar dryer systems transform sludge drying in sunny climates and what environmental and the efficiency benefits it offers

★ How focusing on sludge minimization over wastewater biology can significantly reduce transport costs.

★ How the strain press efficiently removes fibers and plastics from sludge, ensuring cleaner, more manageable waste for disposal.

★ The cost savings achieved by converting sludge into reusable products, reducing landfill and transportation expenses.

★ Grit removal technology, capable of handling finer particles (down to 75 microns) compared to traditional systems (around 300 microns).

★ A belt thermal dryer capable of achieving up to 90% dry solids in sludge, turning it into a product viable for use as fertilizer.

Join us on Engineers for Communities episode with our guest Simon Randle from HUBER Technology US & CA, as we dive deep into Sludge Reduction, Grit Removal & Cost-Saving Dryers and much more!

0%