As temperatures drop, frozen pipes and water main breaks become a major threat to utilities. When water freezes inside pipes, it expands, causing pressure build-up, cracks, and catastrophic bursts. The result? Sudden surges of water loss costly emergency repairs, and disruptions to service.
In many areas, utilities already face significant water loss on average, and freezing conditions make it even worse. If you don’t take action now, your system could be the next to experience a major failure.

Use the Right Backfill Material
Detect Leaks Before Freezing Makes Them Worse
Secure Funding for Infrastructure Upgrades
Don’t wait until it’s too late—protect your system from frozen mainline failures today.
Contact us at or email info@mod-eng.com to discuss how we can help safeguard your water system this winter.