Project

48-lot subdivision with a future industrial site in Lindsay, Texas

MES planned 48 home lots and a 2.5-acre future industrial site in Lindsay, Texas, and designed the detention pond, water line extension and sewer.

New subdivision street, Lindsay, Texas

The problem

A residential development in Lindsay, Texas, covered 14 acres. The plan called for 48 home lots plus a 2.5-acre future industrial site.

The design had to meet TxDOT and City of Lindsay requirements and fit with other developments in the area.

The pathway

MES planned the layout of the 48 lots and the future industrial site.

MES drafted three revisions of the plat.

For stormwater, MES designed a detention pond to manage runoff from the site.

For utilities, the team planned and designed a water line extension to serve the development and designed its sewer system to local codes.

MES balanced the earthwork across the site to limit cut and fill and reduce cost.

Throughout the project, MES worked with the Texas Department of Transportation, the City of Lindsay and other developers in the area.

MES communicated with TxDOT about a turn lane for the subdivision.

MES also attended a City Council meeting for the project.

The result

MES delivered the site plan for the 48 lots and the future industrial site, along with the detention pond, water line extension and sewer design for the development.

The subdivision is built out with concrete streets, curbs, sidewalks and fire hydrants, and homes are going up on the lots.

Site area
14 acres
Home lots
48
Future industrial site
2.5 acres
Stormwater
Detention pond
Agencies
TxDOT and City of Lindsay
  • Subdivision design
  • Detention pond
  • Water and sewer design
  • TxDOT coordination

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.