Aerial view of a metal building and a ground storage tank on a rural site, with an excavator and crew trenching nearby.

What we do

Support for engineering firms

Water and sewer for your next bid: a named lead engineer, a scope and a fixed fee. We never contact your client.

What this covers

Water and sewer scope can decide whether a civil firm bids a job. We work for engineering firms in two ways, and we agree in writing which one applies before work starts.

Two ways to work together

  • A specialty scope under your contract. We design a defined piece of the job, such as the water, wastewater, lift station or site civil scope, and carry its permits. We seal only what we design. Our sheets sit inside your set with our firm name, registration number and seal, as Texas rules require when a set carries more than one license holder’s work.
  • Overflow production under your project manager. We work to your standards, templates and file structure, and you direct the work. By default you supervise it and you seal it. We do not seal work we did not design, and we will not ask you to seal work you did not supervise.

How a work package runs

We start by agreeing the scope, the standards and the deliverable list. Before anything reaches your desk, it goes through our plan QC checklist and a licensed PE’s review. You get the files back in your structure, and we answer the review comments on our sheets.

Most firms start with a small fixed-fee first task on a real project, judged by you before any standing agreement.

Your client stays yours

It is in writing: a mutual non-solicitation covering your clients and staff, for 24 months after our last joint project. Your project manager leads every client conversation, and we never contact or market to your client.

Where we can help

MES is licensed in Texas and eight other states: Colorado, California, Oklahoma, Nevada, Arizona, Florida, Kansas and New Mexico. On a project outside them, we can still produce work under your supervision and seal.

To scope a pursuit or a work package, send the project location, the scope you want covered, your standards and the submittal date.

Start with a first answer

An engineer reads your note and tells you the pathway, the agencies involved and what decides cost and schedule.

Talk partner to partner

Projects

Work like this

Last Dollar PUD HOA Wastewater Treatment Improvement

Colorado

Last Dollar PUD HOA wastewater treatment improvement

MES worked as a subconsultant on the Last Dollar PUD HOA wastewater upgrade. Our scope was the site design, utility layout, and mechanical and process drawings: a defined specialty piece, delivered alongside the project’s other firms.

Read the project
Drone view of a treatment plant under construction, with a steel roof frame over concrete basins and a reservoir beyond

Colorado

Morrison Creek wastewater plant, water tank and booster station

Civil site design and construction observation for a 0.35 MGD plant; the tank and booster station are at preliminary design.

Read the project
Rebar mat on a formed deck with aluminum diamond-plate access hatches set in place, with excavated ground beyond.

CO

Replacement 10,000 gpd wastewater plant for a private school

Civil design, then RFIs, shop drawing review and as-built drawings through construction.

Read the project

Questions

Straight answers

Can you work under our firm’s name as overflow support?

Yes, for overflow production. We work under your project manager, in your standards and your file structure, and you supervise and seal the work. A licensed PE at MES reviews every deliverable before it reaches your desk. When we design a separate scope ourselves, those sheets carry our firm name, registration number and seal inside your set. Your client relationship stays with you.

How do you price work for a firm?

We price most work as a fixed fee for a defined deliverable. Where the scope cannot be fixed, such as agency comments or overflow support, we quote time and materials with a budget. On a bid, we give you a fixed fee for our scope so you can build it into your price.

Will you go after our clients or our staff?

No. It is in writing: a mutual non-solicitation covering your clients and staff, for 24 months after our last joint project.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.