Land Development Engineering in Florida!

We handle your water and wastewater engineering from concept to approval—including design, FDEP permitting, and regulatory compliance. Fast permits, accurate budgets, and projects that stay on schedule.

285+
WWTP

165+
Water/Ice Kiosk

40+
Engineers Team

What We Do

Modern Engineering Solutions—trusted by developers across Florida.

Wastewater

Developing in Florida means navigating complex wastewater requirements. The key question: connect to municipal service or build your own treatment? What’s the actual cost? We handle Treatment Planning, FDEP Permitting, Collection System Design, Lift Stations, Construction Drawings, and Hydraulic Modeling. You get clear answers, honest budgets, and permits that don’t stall out.

Water

Your project needs dependable water service. We help you determine the right solution: city connection, wells, or storage systems? We do Treatment Planning, FDEP Permitting, Distribution Design, Booster Stations, Pressure Vaults, Water Tanks, and Construction Drawings. You get quick answers and construction-ready plans.

Civil Engineering

We handle full site design for your development. That includes Concept Planning, Project Permitting, Construction Drawings, and Kiosk Site Planning. We coordinate grading, drainage, utilities, and paving to keep things moving forward. You get plans that pass local review and contractors can start working from immediately.

Construction Administration

Once construction begins, we’re on site making sure everything runs smooth. We handle construction observation, respond to contractor questions, review submittals, and approve shop drawings. We spot issues before they cost you money, answer questions fast, and keep change orders under control. Fewer headaches, fewer delays, and work done right the first time.Retry

FAQ

Florida DEP permit timelines vary by project type. Domestic wastewater permits typically take 90-120 days. Water system construction permits through FDEP take similar timeframes. We submit complete applications upfront and maintain communication with FDEP reviewers to prevent delays.

Onsite Sewage Treatment and Disposal Systems (OSTDS) are septic systems regulated by county health departments. For developments over 10 lots or certain flow thresholds, you’ll need central collection and treatment with FDEP permits instead. We help determine which option makes sense for your project.

For coastal projects, yes. Florida requires consideration of sea level rise for infrastructure planning. We design collection systems and lift stations with appropriate elevations, flood protection, and electrical systems that account for future conditions based on FDEP guidance.

Surface water discharge in Florida faces strict nutrient limits and may not be feasible in some basins. Many developments use deep injection wells, spray irrigation, or rapid infiltration basins instead. We evaluate all options and recommend the most cost-effective approach that meets water quality requirements.

High groundwater requires careful I&I prevention—watertight joints, properly sealed manholes, and sometimes alternative materials. Lift stations need submersible pumps or special waterproofing. We design systems that work reliably even with seasonal groundwater fluctuations.

Our lift station and treatment facility designs include wind load calculations for Florida’s hurricane zones, backup power systems, flood protection for electrical equipment, and emergency shutdown procedures. Water tanks and elevated structures meet Florida Building Code wind requirements.

Most Florida developments use groundwater from the Floridan Aquifer system. You’ll need a Water Use Permit from the local Water Management District (SFWMD, SWFWMD, SJRWMD, etc.) plus FDEP construction permits. We handle both permitting processes and coordinate with the applicable district.

Yes. Florida’s five Water Management Districts regulate water use permits and sometimes environmental resource permits for stormwater. We regularly work with all WMDs and know their specific requirements and review processes.