Florissant, Colorado Lift Station and Collection Design

Project Overview:

The Florissant Lift Station and Collection System project focused on modernizing critical wastewater infrastructure for the community. This project involved the design of a new influent lift station with a capacity of 57,000 gallons per day and the rehabilitation of 35,000 feet of the existing collection system. These improvements are essential for maintaining reliable wastewater service and supporting future growth in the area. Modern Engineering Solutions (MES) led the design effort, ensuring the project met regulatory standards and aligned with funding requirements.

Our Scope of Work:

Modern Engineering Solutions provided comprehensive engineering services to ensure the project’s success, including:

Lift Station Plans and Specifications:

Our team designed detailed plans and technical specifications for the new replacement lift station, ensuring it meets the capacity requirements and operational needs of the Florissant community.

Engineering Report for CDPHE Submittal:

We prepared a complete engineering report for submission to the Colorado Department of Public Health and Environment (CDPHE), ensuring the project’s compliance with state regulations and permitting processes.

Grant Funding Assistance:

MES assisted local officials with the preparation of grant funding documents to secure financial support for the project, streamlining the process to ensure the community’s needs were met within budget.

Lining Rehabilitation Plans and Specifications:

Our team developed detailed plans and specifications for the collection system rehabilitation, focusing on lining solutions to restore the 35,000 feet of aging pipes.

Review of CCTV Data and Reports:

We reviewed CCTV data and inspection reports to identify problem areas within the existing collection system, ensuring that rehabilitation efforts were targeted for maximum impact.