Modern Engineering Solutions is proud to have contributed as a subconsultant to the Prairie Corner Wastewater Lift Station Project, located in Brighton, Colorado. This vital project focused on improving wastewater management for the community by designing and implementing an efficient lift station system. Our team played a significant role in various aspects of the project, including site plan design, overflow piping, lift station planning, coordination with electrical designers, site plan application preparation, and completion of hydraulic calculations for the lift station.



