Modern Engineering Solutions

74 / 100 SEO Score

Riverdance RV Park Wastewater Treatment Plant – Gypsum, CO

Project Overview:

The Riverdance RV Park Wastewater Treatment Plant (WWTP) project involved the design and construction of a new 40,000-gallon-per-day treatment plant to replace an outdated system that could no longer meet the growing demands and discharge requirements of the expanding RV park. The new WWTP was engineered to handle increased wastewater flows while ensuring compliance with strict effluent limits, including BOD of 5 mg/L, TSS of 1 mg/L, and Total Inorganic Nitrogen (TIN) of 80 mg/L. Modern Engineering Solutions (MES) led the civil design effort, collaborating with the process engineering team to recommend adjustments that optimized system performance. 

Our Scope of Work:

Modern Engineering Solutions played a vital role in the success of the project through the following contributions:

Plans and Specifications:

MES developed detailed engineering plans and technical specifications for the new wastewater treatment plant, ensuring compliance with regulatory standards and best practices in wastewater management.

Coordination with Construction Team:

We worked closely with the construction team to ensure seamless execution, addressing design challenges and providing technical support throughout the construction process.

Civil Site Design:

Our team designed the site layout, incorporating drainage, grading, and utility infrastructure to support the new treatment plant and ensure smooth operations for the RV park.

Call or Text Us