Town of Yampa Wastewater Treatment Plant – Yampa, CO

Project Overview:

The Town of Yampa Wastewater Treatment Plant (WWTP) project involved the design and construction of a new 105,000-gallon-per-day treatment facility to replace an outdated plant that no longer met the town’s wastewater needs or regulatory discharge requirements. The new WWTP ensures compliance with strict effluent limits, including BOD levels below 5 mg/L, TSS below 1 mg/L, and TIN below 21 mg/L, supporting sustainable growth and environmental stewardship. Modern Engineering Solutions (MES) led the civil design efforts, working closely with the process team to optimize system performance through strategic process recommendations.

Our Scope of Work: 

Modern Engineering Solutions was instrumental in delivering the project through the following key contributions: 

Plans and Specifications: 

MES developed comprehensive plans and technical specifications for the new WWTP, ensuring alignment with regulatory requirements and best practices for wastewater treatment. 

Coordination with Construction Team: 

We collaborated closely with the construction team throughout the project, providing ongoing support to address any challenges and ensure smooth execution during each phase. 

Civil Site Design: 

Our team designed the site layout, including grading, drainage, and utility connections, to ensure optimal functionality and long-term operational efficiency for the WWTP. 