Podcast archive
Advanced screening techniques for wastewater challenges | WEFTEC Series 1, episode 8
Mark Turpin of Duperon Corporation on wastewater challenges: screening to remove solids, flushable wipes, the FlexRake IQ and simpler maintenance.
In this episode, we look at Duperon Corporation's solutions for wastewater treatment challenges, with insights from Mark Turpin. The talk runs from screening and storm flows to maintenance and regulations.
Guest
Mark Turpin, Duperon Corporation
In this episode
- Duperon's screening technologies, designed to remove solids and protect downstream processes in municipal wastewater treatment.
- Strategies for the problems caused by so-called flushable wipes, including screens that catch them before they disrupt the sewer system.
- The FlexRake IQ and how it adjusts to changing debris loads and flow rates during peak storm events.
- How Duperon's "less is more" design approach aims for reliable equipment that is easy to maintain and lighter on operators.
- How Duperon works with municipalities on compliance with changing environmental regulations and standards.
Related episode: Simplifying screening design and process, with Terry Duperon in WEFTEC Series 2.
Working on headworks or screening? See MES wastewater engineering in Texas.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748