Modern Engineering Solutions

84 / 100 SEO Score

Arabian Acres Metropolitan District Distribution System Improvement

Project 1 Overview:

The Arabian Acres Metropolitan District Distribution System Improvement Project, an essential initiative aimed at enhancing water distribution infrastructure for a disadvantaged community in Teller County. The client qualified for SRF Loans and Grants, enabling the project to address critical needs for the community. Our team provided construction oversight to ensure the project’s success. 

Our Scope of Work: 

The project encompassed the design of two groundwater treatment plants and one elevated water storage tank, with Modern Engineering Solutions contributing the following services: 

  • Grading: We developed detailed grading plans to optimize site elevations, facilitating efficient plant operations and effective drainage systems. 
  • Utility: Our team coordinated the design and installation of essential utility infrastructure to ensure seamless integration with existing systems and a reliable supply of resources. 
  • Process Design: We meticulously designed the water treatment processes, tailoring them to the specific needs of the community and ensuring compliance with regulatory standards. 
  • Mechanical Equipment Design: Our engineers specified and designed the mechanical equipment necessary for the smooth operation of the treatment plants, ensuring durability and efficiency. 
  • Cut/Fill Calculations: Our experts performed accurate cut and fill calculations to optimize earthwork, reduce costs, and minimize the environmental impact of the project. 

Call or Text Us

Project 2 Overview:

The Arabian Acres Metropolitan District Treatment Improvement Project aimed to improve water treatment and distribution infrastructure for a disadvantaged community in Teller County. Modern Engineering Solutions provided construction oversight and expert assistance, ensuring the project’s success and long-lasting benefits for the community. 

Our Scope of Work: 

  • Design Drawing Packages: Our team created comprehensive design drawing packages to guide the construction and installation of the new pipe network. 
  • Hydraulic Modeling: We conducted in-depth hydraulic modeling for the distribution network, ensuring efficient water flow, pressure management, and overall system performance. 

Through these projects, Modern Engineering Solutions demonstrated its commitment to enhancing the quality of life for disadvantaged communities by leveraging our expertise in engineering and construction oversight.