Modern Engineering Solutions

Containerized Wastewater Treatment: Modular Solutions for Lagoon Upgrades | WEFTEC SERIES | EP 11

Home > Podcast > Containerized Wastewater Treatment: Modular Solutions for Lagoon Upgrades | WEFTEC SERIES | EP 11

-> Join Engineers For Communities Group on Linkedin
-> Watch this Live show here: Linkedin 
-> If you are interested in being a guest on a live show fill book an Onboarding Call 

 

Struggling to meet nitrogen limits? Facing algae outbreaks every discharge season? What if your lagoon could comply without a million-dollar overhaul? 

In this episode of Engineers for Communities, host Michael Groselle, PE presses Ronen Barkan (Fluence Corporation) on practical fixes for rural wastewater systems drowning in regulations. 

  

Episode Highlights: 

✅ Achieve Total Inorganic Nitrogen (TIN) compliance in existing lagoons. 

✅Pre-engineered, containerized upgrades that integrate with legacy infrastructure. 

✅ Low-energy solutions for off-grid or remote areas. 

✅ Cut operational costs with mobile-controlled systems. 

✅ Prevent seasonal non-compliance in lagoon discharges. 

  

Why It Matters: 

Small communities can now meet strict environmental regulations without costly overhauls. Learn how to optimize resources, reduce energy use, and leverage existing assets. 

🔗 Listen now for actionable strategies in rural wastewater management, lagoon upgrades, and sustainable infrastructure. 

  

Follow-Up: 

👉 Engineers, planners, or sustainability advocates – How is your community tackling wastewater challenges? Share below! 

🎧 New episodes drop on selected Thursday.