PFAS Polluters to Pay $14.75 Billion Settlement Direct to Public Water Systems

Today, we’re diving deep into the subject with insights from Sam Wade, former CEO of the National Rural Water Association, and current Water Consultant to Napoli Shkolnik Law to understand the legal landscape and financial opportunities available to utilities grappling with PFAS contamination.
Biden-Harris: Taking a Stand Against PFAS Pollution

The Biden-Harris administration is making gigantic steps in the fight against PFAS pollution which degrades our environment and health.
Lead and Copper Rule Compliance: Strategies for Small Water Systems | CRWA SERIES | EP 1

Join us at the 2024 Colorado Rural Water Association annual conference as we delve into the pressing challenges faced by small and rural water systems. In this first episode, Caroline Miller, LEED AP, CDT (WSP) and Aaron Averett (Sunrise Engineering, Inc.) share how they are teaming up to provide assistance to small systems facing the challenge of complying with the upcoming lead and copper rule revision (Oct. 2024 deadline);
All You Need to Know About America’s Aging Water Infrastructure Crisis

America’s water infrastructure is facing a multitude of challenges that demand our attention and innovative solutions. From aging pipes to water contamination, the issues are diverse, and the consequences can be far-reaching.
Denver Water: Accelerating Lead Service Line Replacement via BIL Funding

Clean water is a must for everyone. Despite delivering lead-free drinking water through the water main, lead can still enter the drinking water of customers with lead service line pipes and fixtures located on their property. Lead in drinking water is a significant health concern, especially for babies, youth, and pregnant women.