Wastewater Residuals: Managing Evolving Regulations | CRWA SERIES | EP 10

Learn about the unique challenges of lagoon cleanouts, regulatory compliance, and how TerraGenesis uses cutting-edge technologies like bathymetric sonar to help small municipalities maintain treatment capacities.
Lead and Copper Rule Compliance: Strategies for Small Water Systems | CRWA SERIES | EP 1

Join us at the 2024 Colorado Rural Water Association annual conference as we delve into the pressing challenges faced by small and rural water systems. In this first episode, Caroline Miller, LEED AP, CDT (WSP) and Aaron Averett (Sunrise Engineering, Inc.) share how they are teaming up to provide assistance to small systems facing the challenge of complying with the upcoming lead and copper rule revision (Oct. 2024 deadline);
Key Take Aways From EP11: “How Inflow and Infiltration Impacts Your Collection System and Wastewater Treatment Plant”

Inflow and Infiltration (I&I) is a critical factor that impacts wastewater collection systems and wastewater treatment plants. Simply put, I&I refers to stormwater and groundwater that unintentionally enters the sewer system. This usually happens via illegal connections, cross connections, foundation drains, roof drains, broken lines, unsealed manholes, or root infiltration.