Modern Engineering Solutions

Lead and Copper Rule Compliance: Strategies for Small Water Systems | CRWA SERIES | EP 1

Join us at the 2024 Colorado Rural Water Association annual conference as we delve into the pressing challenges faced by small and rural water systems. In this first episode, Caroline Miller, LEED AP, CDT (WSP) and Aaron Averett (Sunrise Engineering, Inc.) share how they are teaming up to provide assistance to small systems facing the challenge of complying with the upcoming lead and copper rule revision (Oct. 2024 deadline);