Lead and Copper Rule Compliance: Strategies for Small Water Systems | CRWA SERIES | EP 1

Join us at the 2024 Colorado Rural Water Association annual conference as we delve into the pressing challenges faced by small and rural water systems. In this first episode, Caroline Miller, LEED AP, CDT (WSP) and Aaron Averett (Sunrise Engineering, Inc.) share how they are teaming up to provide assistance to small systems facing the challenge of complying with the upcoming lead and copper rule revision (Oct. 2024 deadline);
All You Need to Know About America’s Aging Water Infrastructure Crisis

America’s water infrastructure is facing a multitude of challenges that demand our attention and innovative solutions. From aging pipes to water contamination, the issues are diverse, and the consequences can be far-reaching.