Project Overview:
The City Limits RV Park in Milford, Texas needed a reliable wastewater lift station capable of serving the full buildout of the facility across all three phases of development. Modern Engineering Solutions coordinated directly with TCEQ and the City of Milford to ensure the design met all regulatory and municipal requirements, delivering a system built for long-term reliable operation.
More Details:
- Project Type: Wastewater Lift Station Design
- Design Capacity: 15,000 gallons per day
- Phases Served: All three phases of RV park development
Our Scope of Work:
Coordination with TCEQ:
MES worked closely with the TCEQ to ensure that all lift station designs complied with regulatory requirements, facilitating a smooth approval process.
Collaboration with the City of Milford:
We coordinated with the City of Milford to align the project with municipal requirements, ensuring the lift station design and installation would integrate seamlessly with the city’s existing wastewater infrastructure.
Lift Station Plans and Specifications:
Our team developed detailed plans and technical specifications for the lift station, addressing the capacity requirements for all three phases of the RV park and providing clear guidelines for contractors.