
About 4,600 feet of new 10-inch HDPE waterline supports expanding commercial and industrial development around Elizabeth, Colorado
10-inch waterline extension for commercial growth in Elizabeth, CO

Project
Four miles of waterline moved clear of TxDOT IH-20 work while Bitter Creek customers kept water service.
Waterline relocation trench near Sweetwater, Texas, October 2024
TxDOT improvements along the IH-20 corridor in Sweetwater, Texas required four miles of existing Bitter Creek Water Supply Corporation waterline to be relocated to avoid conflict with the road project.
Bitter Creek customers needed their water service to stay on throughout the work.
MES worked directly with TxDOT officials so the relocation met the agency's specifications, requirements and timelines.
During construction, MES provided on-site engineering. Staff made regular site visits, flew drone inspections along the waterline and reviewed shop drawings against the design.
In the field, MES set out next steps with the contractors, surveyors and Bitter Creek staff. The team worked through grading and existing utility questions as they came up.
MES wrote field reports during construction and prepared the payment requests submitted to TxDOT for reimbursement.
The four miles of waterline were moved clear of the TxDOT project, and Bitter Creek customers kept water service throughout the work.
Field work wrapped up in December 2024, after 60 field reports.
In February 2025, MES sent TxDOT the final pay application and the as-built drawings.
More projects

10-inch waterline extension for commercial growth in Elizabeth, CO


Morrison Creek wastewater plant, water tank and booster station
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748