Project Overview:

The Town of Yampa’s wastewater collection system had deteriorated to the point where rehabilitation was critical to maintaining reliable service and reducing ongoing maintenance costs. Modern Engineering Solutions led the project from assessment through design, working closely with local officials to develop effective engineering solutions and secure the funding needed to make the improvements financially viable for the town.

More Details:

  • Project Type: Collection System Rehabilitation
  • Pipeline Rehabilitation: 20,000 linear feet
  • Additional Work: Manhole upgrades throughout the system

 

Our Scope of Work:

Grant Funding Assistance:

We collaborated with town officials to prepare grant applications, helping secure the financial resources needed to complete the collection system improvements.

Lining Rehabilitation Plans and Specifications:

Our team developed detailed plans and technical specifications for the lining of existing pipelines and manhole upgrades, ensuring the rehabilitated system would meet industry standards and support long-term performance.

Review of CCTV Data and Reports:

MES analyzed CCTV footage and inspection reports to identify problem areas within the collection system, allowing us to target the most critical areas for rehabilitation and ensure efficient use of resources.