Two existing lagoon ponds with green algae on the surface in a grassy valley, with hills and a stormy sky behind

Project

Town of Yampa wastewater plant and collection system

A 105,000 gpd replacement plant and targeted sewer lining, pipe replacement and manhole upgrades designed for the Town of Yampa.

Existing wastewater lagoons, Yampa, Colorado, May 2024

The problem

The Town of Yampa's wastewater treatment plant had reached the end of its useful life. It could no longer meet the town's needs or its regulatory discharge requirements.

The town's wastewater collection system had also deteriorated. Rehabilitation was critical to keep service reliable and reduce ongoing maintenance.

The pathway

MES led the civil design for a new 105,000 gallon per day replacement plant. The team designed the site layout, grading, drainage and utility connections, and wrote the plans and technical specifications.

The civil work also covered the influent and effluent sewer lines, pre- and post-development drainage, floodplain work and Yampa River sections.

For the collection system, MES reviewed CCTV footage and inspection reports to find the problem areas. MES also built a sewer network priority table.

MES wrote the plans and technical specifications for the collection system improvements. The work lined existing pipelines, replaced some pipe by open cut and upgraded manholes.

MES also worked with town officials to prepare grant applications for the collection system improvements.

The result

The new plant is designed to meet effluent limits of BOD below 5 mg/L, TSS below 1 mg/L and TIN below 21 mg/L.

The CCTV review let MES aim the rehabilitation at the most critical areas of the system.

Collection system construction was under way by July 2024. New sewer pipe was going into open trench, and new precast manholes were going in.

Plant capacity
105,000 gpd
Effluent limits
BOD <5, TSS <1, TIN <21 mg/L
Sewer rehabilitation
Lining, open-cut pipe replacement and manhole upgrades
Targeting
CCTV review and a priority table
Funding
Grant applications
  • Wastewater treatment plant
  • Sewer lining and replacement
  • CCTV review
  • Grant funding support

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.