Cast-in-place concrete tank walls with rebar dowels and timber formwork under construction on a rural site

Project

Phippsburg and Milner wastewater plants and collection system

Two replacement wastewater plants and 20,000 feet of sewer lining designed for two Routt County communities.

New treatment tank under construction, Milner, Colorado, June 2024

The problem

Phippsburg and Milner are two communities in Routt County, Colorado. Their aging wastewater treatment plants could no longer meet growing demand or their discharge requirements.

The collection pipes and manholes in both communities were aging too. They needed rehabilitation to keep service reliable.

The pathway

MES led the civil design for both replacement plants at the same time. The work covered site layout, grading, drainage and utility connections, plus the plans and specifications.

The new plants are sized at 32,500 and 30,000 gallons per day. Their effluent limits include 5 mg/L BOD and 1 mg/L TSS.

For the collection systems, MES prepared lining plans and specifications for 20,000 linear feet of pipe, plus manhole lining and improvements in both communities.

MES worked with local officials to prepare the grant funding documents for the collection work.

During construction, MES supported the construction team and updated the drawings for the Milner influent sewer, lift station and generator pad. MES also reviewed shop drawings for the Phippsburg lining.

The result

Both plants were under construction in 2024. Site photos from May to October 2024 show the new cast-in-place concrete tanks taking shape at both sites.

The grant documents helped both communities secure funding for the collection system upgrades.

In January 2026, MES reviewed the as-built drawings for the lining work in both communities.

Plant capacities
32,500 and 30,000 gpd
Effluent limits
BOD 5 mg/L, TSS 1 mg/L
Pipe lining
20,000 linear feet
Manholes
Lined and improved in both communities
Funding
Grant funding documents
  • Wastewater treatment plant
  • Civil site design
  • Sewer lining
  • Grant funding support

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.