Lift station control cabinets and a backup generator beside a rock-lined drainage swale on newly seeded ground near a highway interchange

Project

Prairie Corner wastewater lift station, Brighton, Colorado

MES planned and designed a wastewater lift station in Brighton, Colorado, from site plan to application, and the station has since been built.

Wastewater lift station, Brighton, Colorado

The problem

A site in Brighton, Colorado needed a wastewater lift station.

The station had to fit the site, connect to the existing infrastructure and manage excess wastewater during high-flow events. It also needed a site plan application to secure approval.

MES started on the station in December 2021.

The pathway

MES laid out the site plan for the lift station, with attention to land use, access and the tie-ins to existing infrastructure.

MES designed the overflow piping so excess wastewater has a managed path during high flows.

MES planned the lift station system to meet local codes and regulations, and completed all of the hydraulic calculations the station needed.

MES wrote and submitted the site plan application.

The result

The station was built. Photos taken in June 2023 show the fiberglass enclosure on its concrete pad, with control cabinets, a standby generator and a rock-lined drainage swale beside a highway interchange.

Views down the concrete wet well show the discharge piping and cables running to the submerged pumps.

Project type
Wastewater lift station design
Location
Brighton, Colorado
MES services
Site plan, overflow piping, lift station planning, hydraulic calculations
Approval path
Site plan application, written and submitted by MES
Built station photographed
June 2023
  • Lift station design
  • Overflow piping
  • Hydraulic calculations
  • Site plan application

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.