Project Overview:
Florissant’s wastewater infrastructure needed a full modernization effort, including a new lift station and rehabilitation of the existing collection system. Modern Engineering Solutions led the design effort, managing everything from the CDPHE engineering report to grant funding assistance, ensuring the community’s needs were met on time and within budget.
Our Scope of Work:
Lift Station Plans and Specifications:
Our team designed detailed plans and technical specifications for the new replacement lift station, ensuring it meets the capacity requirements and operational needs of the Florissant community.
Engineering Report for CDPHE Submittal:
We prepared a complete engineering report for submission to the Colorado Department of Public Health and Environment, ensuring the project’s compliance with state regulations and permitting processes.
Grant Funding Assistance:
MES assisted local officials with the preparation of grant funding documents to secure financial support for the project, streamlining the process to ensure the community’s needs were met within budget.
Lining Rehabilitation Plans and Specifications:
Our team developed detailed plans and specifications for the collection system rehabilitation, focusing on lining solutions to restore the 35,000 feet of aging pipes.
Review of CCTV Data and Reports:
We reviewed CCTV data and inspection reports to identify problem areas within the existing collection system, ensuring rehabilitation efforts were targeted for maximum impact.