Modern Engineering Solutions

53 / 100 SEO Score

Sasakwa Water Tank Improvements – Sasakwa, OK

Project Overview:

The Sasakwa Water Tank Improvements project addresses the challenges posed by an aging water tank in the town of Sasakwa, OK. The tank had deteriorated significantly and required recoating and structural repairs to restore its functionality and extend its service life. Modern Engineering Solutions (MES) collaborated with town officials to develop a comprehensive engineering plan, supporting the town’s efforts to secure grant funding for the project.

Our Scope of Work:

Modern Engineering Solutions provided essential engineering services to ensure the project’s success, including:

Engineering Report to Support Grant Application:

We developed a detailed engineering report that outlined the condition of the tank, repair needs, and associated costs. This report was a crucial part of the grant application, helping the town demonstrate the need for funding and ensuring compliance with grant requirements.

Specifications for Tank Recoating and Repairs:

MES prepared technical plans and specifications for the recoating and repair of the water tank, ensuring the work would meet industry standards and extend the tank’s lifespan. These documents enabled the town to proceed with a precise scope of work for contractors and ensure the repairs align with best practices.

Call or Text Us