Modern Engineering Solutions

Magnolia Center

Magnolia Center

Project Overview:

The Magnolia Center is a 2.67-acre mixed-use commercial development, strategically located in Corinth, Texas. The project comprises a 10,800 sq. ft. office building and a 7,316 sq. ft. retail building featuring a drive-through facility. Currently in the final stages of construction, the development exemplifies the seamless integration of diverse commercial spaces, designed to cater to the evolving needs of the community. 

Our Scope of Work: 

Modern Engineering Solutions played a crucial role in the project’s success by providing extensive coordination with various stakeholders and addressing several challenges. Our contributions included: 

  • Coordination with the City: We worked closely with the city authorities to ensure smooth collaboration during the expansion of Lake Sharon Drive and the implementation of public utility changes. 
  • TxDOT Coordination: Our team liaised with the Texas Department of Transportation (TxDOT) to address the I-35 expansion and right-of-way dedications, ensuring compliance with relevant regulations and requirements. 
  • Frontage Driveway Approval: We successfully navigated the approval process for the frontage driveway along the I-35 access roads, in collaboration with TxDOT and the City of Corinth, overcoming various challenges along the way. 
  • Plan Development and Approval Process: Modern Engineering Solutions managed the entire plan development and approval process, ensuring that the project adhered to zoning regulations, building codes, and other pertinent guidelines. 
  • Detention Pond Design: Our team designed a detention pond to effectively manage both the proposed drainage from the development and existing offsite drainage, contributing to the project’s long-term sustainability and environmental responsibility. 

The Magnolia Center stands as a testament to Modern Engineering Solutions‘ expertise in managing complex commercial development projects, collaborating with diverse stakeholders, and delivering results that exceed client expectations. 

IF YOU HAVE A SIMILAR PROJECT LIKE THIS

Call or Text Us

Exit mobile version