Modern Engineering Solutions

How We Can Serve Your Community

At Modern Engineering Solutions, we understand the challenges communities face when it comes to upgrading and maintaining essential water and wastewater systems. Whether you’re dealing with aging infrastructure, regulatory requirements, or the need for sustainable growth, we provide practical, customized solutions that are built around your specific needs.

Stay Connected

Get educated about improving your system by listening to one of our podcast shows/webinars. 

Watch now!

Collaborate Together

Work closely with our engineering team to design the perfect solution for your community.

Learn more

Complete Projects

Your daily headaches will become a thing of the past as your problems will be solved.

See success stories

Projects

The Arabian Acres Metropolitan District Distribution System Improvement Project, an essential initiative aimed at enhancing water distribution infrastructure for a disadvantaged community in Teller County. The client qualified for SRF Loans and Grants, enabling the project to address critical needs for the community. Our team provided construction oversight to ensure the project’s success.

The Prairie Corner Wastewater Lift Station project focused on improving wastewater management for the community by designing and implementing an efficient lift station system. Our team played a significant role in various aspects of the project, including site plan design, overflow piping, lift station planning, coordination with electrical designers, site plan application preparation, and completion of hydraulic calculations for the lift station.

• Completed 265 projects
• Helped 34 communities

Addressing Community Issues

Are you looking for a role that boosts your resume exponentially?

At Modern Engineering, we use AI to eliminate busy work, deliver projects faster than anyone expects, and actually respect work-life balance. If you want to do real engineering—not just push paper—while helping build the growing water/wastewater firm in multiple states, let’s talk.