Modern Engineering Solutions

PFAS Removal using Aqueous Electrostatic Concentrators | WEFTEC SERIES 2 | EP 2

-> Join Engineers For Communities Group on Linkedin
-> Watch this Live show here: Linkedin 
-> If you are interested in being a guest on a live show fill book an Onboarding Call 

In this episode of Engineers for Communities, host Michael Groselle sits down with Tonya Chandler and Sally Gutierrez from BioLargo to explore cutting-edge solutions for some of today’s toughest environmental challenges. With a focus on PFAS contamination and water quality, this conversation highlights BioLargo’s innovative technologies, from electrostatic concentration units to modular service systems, designed to meet the evolving needs of municipalities and industries.

★ Learn about PFAS detection, its impact on public health, and the evolving regulatory landscape for safe drinking water and wastewater management.
PFAS Removal using Aqueous Electrostatic Concentrators

★ How advanced technologies like BioLargo’s AEC unit effectively removes long-chain and short-chain PFAS while minimizing waste.

★ Understand the importance of tackling PFAS contamination at multiple stages—drinking water, wastewater, and landfill leachate—to prevent reintroduction into aquifers.

★ Explore how BioLargo’s electro-oxidation solutions ensure complete PFAS destruction, rendering the waste non-hazardous for safer disposal.

★ BioLargo provides PFAS removal as a modular service, including controlled off-site destruction under expert supervision, with guarantees for clients.

★ Why innovative solutions offer more sustainable options compared to traditional granular activated carbon (GAC) and ion exchange treatments.