Podcast archive

Efficient pump and grinder systems for small community wastewater | WEFTEC Series 2, episode 10

Jeff Seaton of Boerger talks with Michael Groselle, PE about pumps and grinders that small wastewater systems can maintain in place with less downtime.

Updated · First published

In this episode of Engineers for Communities, host Michael Groselle, PE talks with Jeff Seaton from Boerger about pump and grinder equipment for wastewater treatment. They cover maintenance, plant operations and support for smaller communities.

The main point: pumps and grinders that operators can maintain easily help keep wastewater systems running, even in hard conditions.

Guest

Jeff Seaton, Boerger.

In this episode

  • Boerger's maintenance-in-place (MIP) design, meant to make repairs simpler and cut downtime for operators.
  • How grinders, such as multi-crushers and orbital grinders, handle rags and other debris.
  • Why easy access and quick parts matter for small communities with few staff and tight resources.
  • How rotor shapes and sealing designs affect pump performance and equipment life.
  • How customer feedback shapes Boerger's research and new products.

Read about MES pump and lift station design in Texas.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.