Podcast archive
Containerized wastewater treatment: modular lagoon upgrades | WEFTEC Series 2, episode 11
Ronen Barkan of Fluence on containerized wastewater treatment: modular lagoon upgrades that help small communities meet nitrogen limits.
Many lagoon communities now face nitrogen limits. Ronen Barkan of Fluence explains containerized add-ons that work with an existing lagoon.
In this episode of Engineers for Communities, host Michael Groselle, PE, presses Ronen Barkan of Fluence Corporation on practical fixes for rural wastewater systems under heavy regulation.
The case they make: small communities can meet strict environmental rules without costly overhauls by using the assets they already have and cutting energy use.
Guest
Ronen Barkan, Fluence Corporation
In this episode
- Reaching Total Inorganic Nitrogen (TIN) compliance in existing lagoons.
- Pre-engineered, containerized upgrades that work with legacy infrastructure.
- Low-energy solutions for off-grid or remote areas.
- Lower operating costs with systems controlled from a mobile device.
- Preventing seasonal non-compliance in lagoon discharges.
Planning a lagoon upgrade? See MES package wastewater treatment plants in Colorado.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748