Podcast archive
Wastewater Solutions for Developers and Operators | WEFTEC SERIES 2 | EP 3
Troy Ellison of Cloacina talks with Michael Groselle, PE about planning wastewater treatment plants for developers and designing them for operators.
In this episode of Engineers for Communities, host Michael Groselle, PE talks with Troy Ellison from Cloacina about wastewater plant planning and operational efficiency.
They cover the key points developers should weigh when planning a wastewater treatment plant, and how customizable solutions can improve efficiency and reduce costs. The episode focuses on efficiency, access and long-term success, from planning smarter to keeping maintenance simple.
Guest
Troy Ellison, Cloacina. Hosted by Michael Groselle, PE
In this episode
- Custom wastewater treatment options that meet short-term and long-term development goals, from small capacity units to large systems.
- Cloacina's all-in-one approach to treatment infrastructure, from pump stations to disinfection systems, and how it simplifies the process and reduces costs.
- Avoiding containerized systems in favor of designs that put access, ease of maintenance and efficient operation first.
- Designing with operators in mind: easy access, visibility and maintainability to prevent early failures and extend service life.
- Water reuse, from irrigation to industrial uses, supported by high-quality effluent treatment.
Planning treatment for a new development? See MES package wastewater treatment plant services.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748