Podcast archive

Addressing Small System Challenges with Water and Wastewater Experts | WEFTEC SERIES 2 | EP 1

Steve Wilson of WaterOperator.org on small water system challenges: water loss, operator training, asset management and where to find free help.

Updated · First published

In this episode, Michael Groselle interviews Steve Wilson from WaterOperator.org. They explore the critical issues facing small water systems. They also cover the resources that help municipalities and utilities tackle challenges such as water loss and operator training.

Guest

Steve Wilson, WaterOperator.org

In this episode

  • How WaterOperator.org serves as a clearinghouse of resources for small utilities, so operators can find the information they need.
  • Technical assistance and water loss surveys that help small systems detect and fix leaks in their distribution systems.
  • Free assistance from groups like RCAP to identify problems and secure funding for infrastructure improvements.
  • Why asset management plans help small systems stay financially sustainable and ready for future infrastructure needs.
  • How small communities can handle workforce shortages, keep trained operators from leaving for larger systems, and work together through shared operators.

Related: MES water loss services in Colorado.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.