Modern Engineering Solutions

Arabian Acres Metropolitan District Distribution System Improvement

Project Details

Arabian Acres Metropolitan District Distribution System Improvement Project
61 / 100 SEO Score

Project Overview:

The Arabian Acres Metropolitan District serves a disadvantaged community in Teller County, Colorado that needed significant improvements to both its water treatment and distribution infrastructure. The client qualified for SRF Loans and Grants, and Modern Engineering Solutions delivered two connected projects to address the community’s water system needs from treatment through distribution.

More Details:

  • Project Type: Groundwater Treatment Plant Design, Water Distribution System Improvement
  • Facilities Designed: Two groundwater treatment plants, one elevated water storage tank
  • Funding: SRF Loans and Grants
  • Community: Disadvantaged community designation

 

Project 1 Scope of Work:

Grading:

We developed detailed grading plans to optimize site elevations, facilitating efficient plant operations and effective drainage systems.

Utility:

Our team coordinated the design and installation of essential utility infrastructure to ensure seamless integration with existing systems and a reliable supply of resources.

Process Design:

We meticulously designed the water treatment processes, tailoring them to the specific needs of the community and ensuring compliance with regulatory standards.

Mechanical Equipment Design:

Our engineers specified and designed the mechanical equipment necessary for the smooth operation of the treatment plants, ensuring durability and efficiency.

Cut/Fill Calculations:

Our experts performed accurate cut and fill calculations to optimize earthwork, reduce costs, and minimize the environmental impact of the project.

 

Project 2 Scope of Work:

Design Drawing Packages:

Our team created comprehensive design drawing packages to guide the construction and installation of the new pipe network.

Hydraulic Modeling:

We conducted in-depth hydraulic modeling for the distribution network, ensuring efficient water flow, pressure management, and overall system performance.

Working on a Similar Project? Let's Talk.