Town of Sasakwa water tank improvements

The town's water tank recoating and structural repairs were completed, carried from an MES grant engineering report and specifications through bidding and construction.

Elevated water storage tank before improvements, Oklahoma

The problem

The Town of Sasakwa, Oklahoma had an aging water storage tank. Its coating had broken down and the structure showed wear, which put its reliability at risk.

Site photos of the tank show peeling paint, exposed primer, rust streaks and corrosion at the base.

The tank needed recoating and structural repairs, and the town needed grant funding to pay for them.

The pathway

MES worked with town officials to assess the tank's condition.

MES wrote an engineering report on the tank's condition, repair needs and costs. The report documented the need for funding and supported the town's grant application.

Once funding was secured, MES prepared the plans and technical specifications for recoating and structural repair. They gave the town a precise scope of work for contractor bidding.

MES then supported bidding, prepared the contract and provided construction phase services.

The result

The town secured its funding. The specifications set out the recoating and repairs needed to extend the tank's service life.

MES worked on the notice of award in November 2025 and reviewed the paint submittal in February 2026.

The tank recoating and structural repairs were completed. MES worked on project closeout in April 2026.

Funding
Grant, supported by an MES engineering report
Repairs
Recoating and structural repair, completed
Bid documents
Plans, specifications and bid documents
Bid and construction phase
Notice of award, contract, paint submittal review
Closeout
April 2026
  • Water storage tank
  • Grant engineering report
  • Coating specifications
  • Bidding and construction phase

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.