Skip to main content

Modern Engineering Solutions

The Role of Environmental Engineers in the Wastewater

In today's world, protecting water resources is more critical than ever. At the heart of this mission are environmental engineers, the professionals who design, implement, and refine systems that manage wastewater safely and sustainably. Their work not only protects public health but also preserves the environment for future generations.

At Modern Engineering Solutions, we understand just how pivotal environmental engineers are to the success of our projects and our communities. As we continue to expand, we are actively seeking passionate environmental engineers to join our team and help us drive innovative wastewater solutions across Colorado and Texas.

The Role of Environmental Engineers in the Wastewater
83 / 100 SEO Score

What Does an Environmental Engineer Do in Wastewater Management? 

Environmental engineers play a wide-ranging and essential role in the wastewater sector. Their key responsibilities typically include:

Designing Treatment Systems

Environmental engineers design systems that treat wastewater to meet or exceed regulatory standards. They work with a variety of technologies, including: 

  • Conventional activated sludge systems 
  • Sequencing batch reactors (SBRs) 
  • Decentralized treatment systems 
  • Advanced nutrient removal processes 

Their designs must balance performance, operational ease, energy efficiency, and long-term sustainability.

Regulatory Compliance and Permitting

Navigating complex regulations—such as those from the EPA or state agencies like the Colorado Department of Public Health and Environment (CDPHE) or TCEQ in Texas—is a major part of an environmental engineer’s role. They ensure designs comply with discharge permits, effluent limits, and public health standards, often coordinating closely with regulators throughout the project lifecycle. 

Environmental Impact Analysis 

Before construction begins, environmental engineers assess the potential impacts wastewater projects might have on surrounding ecosystems. They develop strategies to mitigate risks like groundwater contamination, surface water pollution, or habitat disruption. 

Operations and Troubleshooting

Beyond design, environmental engineers often assist operators by: 

  • Diagnosing operational issues in treatment plants 
  • Recommending system optimizations 
  • Training staff on new technologies and compliance requirements This real-world support ensures facilities run efficiently and remain compliant over time. 

 

Supporting Water Reuse and Sustainability Initiatives

Water scarcity is pushing more communities to explore reuse projects, where treated wastewater is repurposed for irrigation, industrial uses, or even potable supply. Environmental engineers help design and permit these innovative systems, contributing to a more resilient water future. 

Why Choose Modern Engineering Solutions? 

At Modern Engineering Solutions (MES), based in Golden, Colorado, we specialize in practical, forward-thinking solutions for wastewater treatment, collection systems, and reuse systems. Our projects range from supporting small rural communities to helping fast-growing developers plan sustainable infrastructure. 

We are passionate about improving how communities manage their water resources—and we know that the right environmental engineers are key to that mission. 

Here’s what you can expect when you work with MES: 

  • A collaborative, supportive environment where your ideas are valued 
  • Exposure to a wide range of projects, from small-town lagoon upgrades to cutting-edge decentralized treatment systems 
  • Opportunities to work directly with clients, regulators, and operators 
  • A company that balances innovation with practicality—we focus on real solutions, not just theoretical designs 

Join Our Team!   

We are currently looking for a professional Environmental Engineer to help expand our wastewater services team. If you are passionate about protecting water resources, enjoy solving technical challenges, and want to make a real-world impact, we would love to hear from you. 

Interested candidates can learn more at mod-eng.com/career or reach out directly to our team. Let’s work together to build a cleaner, stronger future for our communities. 

 

Got a Project Question? Talk to Michael.

300+ projects. 9 state licenses. Senior-level answers in 15 minutes, not a sales pitch.

Michael Groselle, P.E.

Michael is the founder and CEO of Modern Engineering Solutions (MES), a water and wastewater engineering firm licensed across 9 states with 300+ completed projects. He holds a civil engineering degree from The Citadel, The Military College of South Carolina, where he played Division I basketball. Michael built MES from zero clients to a 40-person firm delivering senior-level engineering for municipalities, developers, and civil firms across Texas, Colorado, and beyond. He hosts the MES Podcast with 60+ episodes on water infrastructure and engineering business, and authored "Engineer Your Freedom," a practical guide for engineers building independent practices. Outside of engineering, Michael is a 3x American Ninja Warrior competitor and AVP professional beach volleyball player.