Aerial view of a brick retail building with a metal roof and awnings beside a striped concrete parking lot.

Who we serve

Developers and builders

Residential, commercial, industrial, battery storage and data center sites, inside or outside city limits

Retail building and parking lot from the air, Seagoville, Texas

Developers and builders

In writing, before your option period ends: can this site be served, how, and at what cost.

Residential, commercial, industrial, battery storage and data center sites, inside or outside city limits

  • Feasibility before you close, so you underwrite a known number
  • Every pathway: city connection, package plant, land application, 210E reuse, CCN and ETJ release, MUD
  • Site civil, platting, drainage and permits from one team, battery storage and data center sites included
  • Feasibility
  • 210E reuse
  • ETJ release
  • Site civil
  • BESS
  • Data centers
Get a feasibility review

Proof · Taylor, TX

Business park reuse after a county septic denial in Taylor, TX

The county denied the septic permit. We moved the wastewater to a state 210E reuse authorization with zero discharge, approved in 4 weeks.

Read the project

Most developer work starts with site feasibility: can the site be served, how, and at what cost. From there we carry the site civil design, the wastewater and water permits and, where a site needs it, battery storage site civil or floodplain studies.

More projects

Finished stone and brick commercial buildings with landscaped grounds and mature oak trees under a clear blue sky.

Corinth, TX

2.67-acre office and retail center on I-35 in Corinth, TX

A built commercial site with a TxDOT driveway approval and detention design.

Read the project
New concrete residential street with sidewalks and sod beside finished homes and graded lots

Lindsay, TX

48-lot subdivision in Lindsay, Texas

A 48-lot layout with detention, water and sewer design.

Read the project

Talk to an engineer

Tell us about your project, developers.

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.