A TCEQ 210E authorization in 10 weeks let a 1.0 MGD mixed-use development in San Marcos bypass a discharge permit and its hearings.
1.0 MGD zero-discharge reuse for a mixed-use development

Project
MES planned 48 home lots and a 2.5-acre future industrial site in Lindsay, Texas, and designed the detention pond, water line extension and sewer.
New subdivision street, Lindsay, Texas
A residential development in Lindsay, Texas, covered 14 acres. The plan called for 48 home lots plus a 2.5-acre future industrial site.
The design had to meet TxDOT and City of Lindsay requirements and fit with other developments in the area.
MES planned the layout of the 48 lots and the future industrial site.
MES drafted three revisions of the plat.
For stormwater, MES designed a detention pond to manage runoff from the site.
For utilities, the team planned and designed a water line extension to serve the development and designed its sewer system to local codes.
MES balanced the earthwork across the site to limit cut and fill and reduce cost.
Throughout the project, MES worked with the Texas Department of Transportation, the City of Lindsay and other developers in the area.
MES communicated with TxDOT about a turn lane for the subdivision.
MES also traveled to a city council meeting for the project.
MES delivered the site plan for the 48 lots and the future industrial site, along with the detention pond, water line extension and sewer design for the development.
Photos of the development show new concrete streets with curbs and sidewalks, a fire hydrant, fresh sod and finished homes beside graded lots. More houses were still going up when the photos were taken.
More projects

1.0 MGD zero-discharge reuse for a mixed-use development

2.0 MGD wastewater reuse authorization for a mixed-use development

Industrial zero-discharge reuse in Taylor, TX, approved within 6 weeks of submission
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748