A packaged wastewater treatment plant on a concrete pad with white process piping and stainless tanks under an overcast sky.

Who we serve

Landowners

Dairy, ranch and agricultural landowners with a TCEQ land-application or reuse application

Landowners

A stalled TCEQ application? A free first read tells you if a faster path fits

  • Land application and reuse authorizations, including 210E
  • Help finding and setting up an off-site reuse agreement, when your permit needs one
  • Brokers and land consultants: send us your client’s tract; the relationship stays yours
  • 210E reuse
  • Land application
  • TLAP
  • Referral partners
Ask for a free first read
A packaged wastewater treatment plant on a concrete pad with white process piping and stainless tanks under an overcast sky.

Proof · Martindale, TX

2.0 MGD reuse authorization for a development with a data center and batch plant

The landowner’s part: a local tree farm and sod operation takes the treated water for irrigation under a reuse agreement, with a 53 acre-foot storage reservoir. TCEQ approved the 210E authorization in 4 weeks.

Read the project

Most landowner work is wastewater permitting: land application, reuse and the agreements behind them. Some sites also need water design or a feasibility review before a sale or a lease.

More projects

New concrete subdivision street with curb and a fire hydrant beside homes under construction and open farmland.

Ranch water system model and fire memo

A water model and fire flow memo for a ranch, which led to added pressure control.

Read the project
Stone retaining wall with a stepped drainage channel beside a curved paved path and a wooded lawn.

Johnson County, TX

Septic and stormwater design for a Johnson County site

Septic design, the permit package and stormwater design for a rural Texas site.

Read the project

Talk to an engineer

Tell us about your project, landowners

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.