2.67-acre office and retail center on I-35 in Corinth, TX

A 2.67-acre office and retail center in Corinth, Texas, won its I-35 frontage driveway approval and was built.

Completed buildings and site work in Corinth, Texas, September 2022.

The problem

A 2.67-acre commercial site in Corinth, Texas, was planned for a 10,800 sq ft office building and a 7,316 sq ft retail building with a drive-through.

Lake Sharon Drive was being widened and public utilities relocated. The I-35 expansion and right-of-way dedications also had to be worked out with TxDOT.

The site also had to manage its own drainage plus drainage arriving from off site.

The pathway

MES managed the plan development and the approval process.

The team worked with the City of Corinth through the Lake Sharon Drive expansion and the utility changes.

It worked with TxDOT on the I-35 expansion and the right-of-way dedications.

The frontage driveway on the I-35 access road went through an approval process with TxDOT and the City of Corinth. MES worked through the challenges along the way and won that approval.

MES designed a detention pond that manages both the new development's runoff and the existing off-site drainage.

The result

The driveway was approved and the center was built.

Photos from September 2022 show the stone and brick buildings finished, with new paved parking, landscaped beds and young trees in place.

Site
2.67 acres
Office building
10,800 sq ft
Retail building
7,316 sq ft, with drive-through
Access
I-35 frontage driveway, approved through work with TxDOT and the City of Corinth
Drainage
Detention pond for on-site and off-site flows
  • Site civil design
  • TxDOT coordination
  • Detention design
  • Site plan approvals

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.