A lined, aerated wastewater lagoon in a green hillside valley under a blue sky with clouds.

Who we serve

Utilities and municipalities

Small and mid-sized cities, water districts and MUDs in Texas, Colorado, Oklahoma and the other states where we are licensed

Utilities and municipalities

Ready for your next funding deadline: scope, cost estimate and engineering report

  • Funding-ready engineering reports for SRF and grant programs
  • I&I, water loss and condition studies that end in a ranked plan
  • Treatment, collection, storage and distribution, sized to how the system really runs
  • Funding support
  • I&I studies
  • Water loss
  • Lift stations
  • WWTP design
Plan for your next deadline
Drone view looking straight down on an open pipeline trench along a cleared corridor through red-soil scrubland

Proof · Sweetwater, TX

Bitter Creek Water Supply IH-20 waterline relocation

Four miles of waterline moved for TxDOT’s IH-20 work, with customers’ water kept on throughout. MES provided the construction-phase engineering.

Read the project

For utilities and municipalities we design water and wastewater systems, write the condition and grant reports that help pay for them, and support bidding and construction. Where work sits near a river or creek, see floodplain studies.

More projects

Low-angle view of an aging elevated water storage tank with heavily peeling white and brown paint against a blue sky.

Sasakwa, OK

Town of Sasakwa water tank improvements

The condition and grant report, repair plans, bidding and construction support. The repairs are complete.

Read the project
Lined wastewater lagoon beside a dirt access road, with a small red building and hills under a clear sky

Oak Creek, CO

Town of Oak Creek I&I and water loss analysis

Infiltration, inflow and water loss measured, with a prioritized improvement plan.

Read the project

Talk to an engineer

Tell us about your project, utilities

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.