Skip to main content

Modern Engineering Solutions

Fast-Track Your Texas
Land Development Project
With Our Expertise

Break ground 6 months earlier with TCEQ permits in 8 weeks instead of 12 months. We deliver complete submittals, predictable costs, and systems designed for Texas soil conditions and regulatory requirements.

What We Do

Modern Engineering Solutions supports Texas developers with water, wastewater, and civil engineering across all 254 counties.

Wastewater Engineering

We design wastewater systems that pass TCEQ review the first time. You get treatment plans, collection system layouts, lift station specs, and hydraulic models sized for actual site conditions, not generic templates. From MUD developments in Harris County to private package plants in the Hill Country, we coordinate with regional TCEQ offices and deliver construction-ready drawings the day your authorization arrives. Your contractor starts digging with plans they can build from, and your timeline stays intact.

Water Engineering

We handle water supply from feasibility through final design. That means groundwater district coordination, well permitting, distribution line sizing, storage tank design, and booster station specs that meet peak demand requirements. Whether you’re connecting to Fort Worth Water, drilling into the Trinity Aquifer, or treating brackish groundwater in South Texas, we work with the right authorities and deliver stamped plans contractors can price accurately. You get water systems that support your project at full buildout, not just Phase 1.

Civil Engineering

We coordinate your complete site package so utilities, grading, drainage, and paving work together from the start. You get concept plans with utility easements mapped correctly, construction drawings with accurate tie-ins to existing systems, detention pond sizing that meets county requirements, and TxDOT access permit coordination. Civil firms bring us in when water and wastewater drive the site layout and your schedule can’t absorb multiple revision cycles. Plans get approved because everything lines up the first time.

Construction Administration

We stay on your project through construction so contractor questions get answered the same day, not two weeks later. That means site observation during critical installations, RFI responses within 24 hours, shop drawing reviews against permit conditions, and change order documentation that keeps your closeout package clean. When the inspector questions a connection detail or a utility conflict shows up in the field, you get a licensed engineer on-site making decisions. Problems get solved before they delay your schedule.

Projects

From lift stations to treatment plants, MES delivers water and wastewater engineering for TX land developers - fewer revisions, faster approvals, and costs you can count on.

Get in Touch!

Not Sure What Approvals Your Project Needs?

Texas development requires coordinating TCEQ, groundwater districts, county authorities, and municipal utilities. We’ll review your project scope, identify required permits, and outline a timeline in a 15-minute call. No cost, no commitment.