Skip to main content

Modern Engineering Solutions

Fast-Track Your Florida
Land Development Project
With Our Expertise

Break ground faster with FDEP permits in 8 weeks instead of 12 months. We deliver complete submittals, predictable costs, and systems designed for Florida’s high water tables and coastal requirements.

What We Do

Modern Engineering Solutions supports Florida developers with water, wastewater, and civil engineering across all five Water Management Districts.

Wastewater Engineering

Florida’s high water table means collection systems sit in groundwater year-round. We design for wet trench conditions, specify sealed manholes, and size systems assuming infiltration rates standard calculations miss. FDEP now requires nutrient removal in most coastal counties. Your contractor gets drawings that account for dewatering costs, and your permit reflects actual treatment standards, not outdated secondary requirements.

Water Engineering

Water supply requires Water Management District approval before you design anything. We handle consumptive use permits with SFWMD, SWFWMD, or SJRWMD, account for saltwater intrusion limits in coastal zones, and coordinate utility interconnects. You know if your supply is viable before spending on engineering that can’t get permitted. Wells get sited where drawdown restrictions allow actual withdrawal.

Civil Engineering

Florida grading means building up to meet base flood elevation, not cutting down. We design site layouts that minimize fill costs, coordinate environmental resource permits with your Water Management District, and sequence utilities so dewatering doesn’t destabilize adjacent properties. Stormwater connections to regional systems get sized correctly. Plans pass review because flood compliance is designed in from the start.

Construction Administration

Florida inspectors require certified elevation surveys because insurance underwriting depends on accurate as-builts. We verify benchmarks before foundations pour, inspect during dewatering operations, and document final grades against approved flood maps. Hurricane season means scheduling around weather shutdowns. Projects close on time because elevation certificates match permit conditions and stormwater systems perform as designed.

Projects

From lift stations to treatment plants, MES delivers water and wastewater engineering for FL land developers - fewer revisions, faster approvals, and costs you can count on.

Get in Touch!

Not Sure What Approvals Your Project Needs?

Florida development requires coordinating FDEP, Water Management Districts, local building departments, and coastal construction control lines. We’ll review your project scope, identify required permits, and outline a timeline in a 15-minute call. No cost, no commitment.