Skip to main content

Modern Engineering Solutions

Septic Tank & Absorptive Drainfield

Septic Tank & Absorptive Drainfield
69 / 100 SEO Score

Septic tanks and absorptive drainfields are two common wastewater treatment technology options for on site treatment. Septic tanks work by breaking down the waste matter in the sewage into small particles that can be removed by the soil. Septic tanks are a cheap option, but they require frequent maintenance to remove the waste matter and other matter that is not broken down. Gravel or slag can be added to the tank to make it a more effective means of treatment. Septic tanks can be used to treat domestic sewage, but they are typically not suitable for the treatment of industrial waste.

Absorptive drainfields use a layer of sand or other absorbent material to soak up water and waste, then displace it through a trench to an underground drainage system. A septic tank absorption field system is a type of subsurface irrigation that uses aerated soil in the tank to help eliminate excess salts from the treated water. The system consists of a buried pipe that connects a septic tank to an underground, pressurized distribution system. Aeration of the soil in the tank allows for the water to be pumped through the pipe and then out into a subsurface drip or sprinkler system.

There are many different types of treatment and disposal options when looking to treat wastewater on-site. If you need help understanding local and state regulations or have questions about when system suites your use best reach out to us today!

Got a Project Question? Talk to us now.

Michael Groselle, P.E.

Michael is the founder and CEO of Modern Engineering Solutions (MES), a water and wastewater engineering firm licensed across 9 states with 300+ completed projects. He holds a civil engineering degree from The Citadel, The Military College of South Carolina, where he played Division I basketball. Michael built MES from zero clients to a 40-person firm delivering senior-level engineering for municipalities, developers, and civil firms across Texas, Colorado, and beyond. He hosts the MES Podcast with 60+ episodes on water infrastructure and engineering business, and authored "Engineer Your Freedom," a practical guide for engineers building independent practices. Outside of engineering, Michael is a 3x American Ninja Warrior competitor and AVP professional beach volleyball player.

Michael Groselle - CEO of Modern Engineering Solutions - Profile Image 3

Michael Groselle, P.E.

I'm a licensed P.E. with over a decade of experience in water and wastewater engineering. My book "Engineer Your Freedom," a practical guide for engineers thinking about building a practice of their own.

Amazon Reviews

(15)
Engineer Your Freedom by Michael Groselle, P.E. The practical guide for engineers ready to build a firm without debt, burnout, or permission. Get your copy on Amazon.