Managing Colorado’s Aging Water Infrastructure Using Key Strategies

In communities across America, water infrastructure installed during the Johnson and Nixon administrations continues to serve as the backbone of local water supply systems. These aging networks, now approaching or exceeding their 50-year design life, present significant challenges for operators, engineers, and municipal leaders. A recent conversation with a rural Colorado water system operator offers valuable insights into effective management strategies that balance technical, financial, and community considerations.
Public Water System Design and Implementation in Texas

Designing a new public water system in Texas requires a careful balance of hydraulic design, regulatory compliance, and construction best practices.
Septic Tank & Absorptive Drainfield

Septic tanks and absorptive drainfields are two common wastewater treatment technology options for on site treatment. Septic tanks work by breaking down the waste matter in the sewage into small particles that can be removed by the soil. Septic tanks are a cheap option, but they require frequent maintenance to remove the waste matter and […]
7 Basics Necessities for Septic Systems

Septic systems are a necessary part of many homes in the United States, but they can also be quite expensive to install and maintain. Here are some basics for those looking to install or maintain a septic system in Texas: 1) Septic systems work by absorbing waste from toilets and sinks into small holes located […]