Septic Tank & Absorptive Drainfield

Septic tanks and absorptive drainfields are two common wastewater treatment technology options for on site treatment. Septic tanks work by breaking down the waste matter in the sewage into small particles that can be removed by the soil. Septic tanks are a cheap option, but they require frequent maintenance to remove the waste matter and […]