Skip to main content

Modern Engineering Solutions

Modern, Cost-Effective Water and Wastewater Engineering

We help developers, municipalities, and civil engineering firms across New Mexico deliver NMED-compliant water and wastewater infrastructure on aggressive timelines.

From NMOSE water rights to NMED discharge permits, we compress typical 12-month permitting cycles to 6–8 weeks.

Engineering Built for Outcomes, Not Overhead

Water and wastewater projects in New Mexico fail when schedules slip, designs overreach, or permitting risks are not addressed early. We engineer with those realities in mind from day one.

Value Over
Hours

We do not bill by the hour. We price around outcomes, permits secured, schedules protected, systems sized correctly for New Mexico’s arid conditions and NMED requirements.

Speed as a Design Constraint 

Time to permit and time to water matter as much as hydraulics and code compliance. In a development market constrained by water availability, we treat schedule as a core design input, not an afterthought.

Deep Work, Not Meeting Culture 

Our engineers are organized for focused problem-solving, not constant meetings. Fewer handoffs and fewer revisions lead to cleaner submittals and faster NMED review cycles.

AI as Leverage, Not a Shortcut 

We use AI to streamline drafting and documentation so licensed Professional Engineers can focus on judgment, coordination, and quality. All technical decisions are made and reviewed by PEs.

Who We Support

We work with clients across New Mexico who need fast, reliable engineering without slow delivery or inflated feasibility reports.

Municipalities and Water Districts

Small and mid-sized communities across New Mexico face aging infrastructure, water scarcity pressures, and tight funding windows. We deliver clear recommendations sized to local budgets and aligned with NMFA (New Mexico Finance Authority) and CWSRF/DWSRF funding strategies.

Developers and Industrial Owners 

Developers building along the Rio Grande corridor, in Albuquerque metro, and across Doña Ana, Sandoval, and Bernalillo counties need fast feasibility answers, realistic costs, and a clear NMED path before capital is committed. We specialize in NMED discharge permits and NMOSE water rights coordination that cut typical permitting timelines down to 6–8 weeks.

Civil Engineering Firms

Civil firms without in-house water or wastewater capability or teams hitting PE bottlenecks during a busy development cycle, rely on us as a dependable utility partner. We handle feasibility, NMED submittals, NMOSE coordination, and construction support so your projects stay on schedule.

What We Do

Every service is designed around constructability, permitting success, and cost control, for the specific regulatory environment developers face in New Mexico.

Wastewater Engineering

Collection systems, treatment plants, I&I studies, and facility upgrades. One clear recommendation, realistic costs, and submittals built to move through NMED Surface Water Quality Bureau review with minimal revisions. Our discharge permit experience has saved clients 21+ months of permitting time per project.

Water Engineering

Wells, storage, distribution, and treatment systems designed around New Mexico’s water scarcity, NMOSE water rights requirements, and real construction budgets. We deliver feasibility clarity early so schedule delays don’t cost more than the design fees.

Civil Engineering

We handle the water and wastewater portion of civil projects so your team moves faster. Ideal for firms needing overflow support, specialized utility expertise, or PE capacity during peak demand periods.

Construction Administration

We stay engaged during construction with fast responses and clear clarifications that prevent change orders caused by ambiguity. Our engineers understand New Mexico conditions, contractor availability, and local utility coordination through completion.

Get Permit Solutions, Faster Timeline And Cost Estimate

Projects

From lift stations to treatment plants, MES delivers water and wastewater engineering for NM municipalities, developers, and engineering firms - fewer revisions, faster approvals, and costs you can count on.

Blog/Newsletter

Wide shot of a biosolids land application operation at a Texas agricultural field showing a tanker truck spreading treated sludge across a flat pasture with a private wastewater treatment facility visible at the field edge representing the Chapter 312 compliant disposal pathway that Modern Engineering Solutions helps private WWTP owners establish before plant startup

Most developers who build a private wastewater treatment plant spend their engineering budget on the TPDES permit, the treatment train design, and the TLAP or 210E authorization for effluent disposal. Almost none of them spend equal attention on what happens to the sludge. That …

Why Choose Modern Engineering Solutions

  • Clear Direction

    One clear engineering path based on judgment and cost reality. No inflated reports, no option sets built to justify presentation time. New Mexico developers get definitive answers, not three alternatives and a recommendation to "study further."

  • Cost-Effective Systems

    We design systems that meet NMED requirements without overbuilding. Every design reflects how projects are actually constructed, operated, and maintained in New Mexico's arid climate conditions, not how they look in a standard-spec manual.

  • Predictable Timelines

    Fewer submittal cycles and better coordination lead to faster approvals. Our drawings and narratives give NMED reviewers what they need upfront, critical as application volumes surge statewide and backlogs lengthen for unprepared submittals.

  • Senior-Level Partnership

    Direct access to experienced engineers, clear communication, and respect for project schedules, budgets, and decision-making processes. No layers of management between you and the PE doing the work.

Get in Touch!

Have a question about our services? Not sure if you need an engineer?

Give us a call or leave a message and we’ll contact qualified projects within few working hours!

Two Agencies. Two Sets of Rules. We Know Both

NMED discharge permitting and NMOSE water rights coordination, both shown below, operate under constraints that catch out-of-state firms off guard. We account for what each agency requires before design begins, not after review reveals the gaps.