What Is Water and Wastewater Engineering?

Water and wastewater engineering is a field of engineering focused on water supply and sewage systems. It covers everything needed to provide clean drinking water to communities and safely remove and treat wastewater (sewage). In simple terms, this field makes sure the water coming out of your tap is safe to drink and that used water from sinks and toilets is cleaned before it goes back into the environment. This work is vital for protecting public health and the environment in places like Golden, Colorado and beyond.