Skip to main content

Modern Engineering Solutions

Morrison Creek Metropolitan Water & Sanitation District Treatment Improvement​

Project Details

Morrison Creek Metropolitan Water & Sanitation District Treatment Improvement
50 / 100 SEO Score

Project Overview:

Morrison Creek Metropolitan Water and Sanitation District needed a new wastewater treatment facility to meet the evolving needs of the Routt County community while adhering to stringent environmental and safety standards. Modern Engineering Solutions contributed comprehensive civil design services, covering everything from grading and drainage to on-site construction observation.

More Details:

  • Project Type: Wastewater Treatment Plant Design and Construction
  • Design Capacity: 0.35 MGD (350,000 gallons per day)
  • Services Provided: Civil Site Design, Grading, Drainage, Paving, Utilities, Construction Observation

 

Our Scope of Work:

Grading:

Our team developed precise grading plans to optimize site elevations and ensure proper drainage, facilitating efficient plant operations and minimizing environmental impacts.

Utility:

We coordinated the design and installation of essential utility infrastructure, enabling seamless integration with existing systems and ensuring the uninterrupted supply of vital resources.

Paving:

Our engineers devised high-quality paving solutions to guarantee safe and durable surfaces throughout the facility, catering to the demands of heavy vehicular traffic and equipment.

Drainage:

We conducted thorough analyses and designed robust stormwater management systems to prevent flooding, safeguard water quality, and protect the facility from potential damage.

Cut/Fill Calculations:

We performed accurate cut and fill calculations to optimize the earthwork, minimize costs, and reduce the environmental footprint of the project.

Construction Observations:

Our experienced professionals provided on-site construction observation services, closely monitoring progress and quality to ensure the project was executed in accordance with design specifications and industry best practices.

Working on a Similar Project? Let's Talk.