Skip to main content

Modern Engineering Solutions

67 / 100 SEO Score

Summit Metro District Distribution Improvements – Elizabeth, CO

Project Overview:

The Summit Metro District Distribution Improvements project involved the design and installation of a 0.50-mile extension of 10” HDPE waterline to support expanding commercial and industrial development in the region. This new mainline extension ensures reliable water service for future growth, enhancing infrastructure capacity to meet increasing demand. Modern Engineering Solutions (MES) led the design effort and provided engineering support throughout the project to ensure its seamless execution.

Our Scope of Work:

Modern Engineering Solutions delivered key engineering services to drive the success of this project, including:

Engineering Design and Specifications:

MES developed detailed designs and technical specifications for the 10” HDPE waterline, ensuring the new infrastructure aligns with district standards and operational requirements.

Construction Engineering Services:

Our team provided ongoing engineering support during construction, conducting site visits, reviewing contractor submittals, and addressing technical challenges to ensure the project was completed efficiently and according to plan.

Call or Text Us