Water Balance Studies Under 30 TAC §309.20: What They Require and Who Prepares Them
Every reuse-based wastewater permit in Texas depends on one engineering analysis to hold together: the water balance study. Get it right and the permit moves. Get it wrong and you will be answering TCEQ deficiency notices for months while your project carries costs it was never designed to absorb.